Ansals Highland Park Gurgaon: Ansal Housing presents Ansals Highland Park, a group housing project spread over 11.70 acres approx. near Dwarka Expressway. It is a Near Possession Project by at Sector- 103, Gurgaon, offering premium 2 and 3 BHK Apartments.
Project features
Gated high-rise development with controlled entry/exit points
Choice of 2 BHK, 3 BHK, 3 BHK + Utility & 3 BHK+ 1 Room+ Utility | Only 620 units spread through 8 Towers
Abundant green open spaces with inviting Central Park | Adequate Power back-up
Landscaped courtyards | Jogging track & cosy sit-outs | Soothing water bodies
Adequate power back-up | 24 x 7 security | Pedestrian walkways | Facilities management
Location
Sitemap
Floor Plans and Unit Plans
Specifications
Earthquake resistant RCC framed construction with infill brick walls.
Living/Dining/Family Lobby – Italian Stone finish virtified tile (2’x2′) | Master Bedroom – Wood finish virtified tile (2’x2′)
Other Bedrooms – Italian Stone finish virtified tile (2’x2′) | Kitchen – Italian Stone finish virtified tiles
Toilet/ Balcony/ Terrace – Anti-skid ceramic tiles | Staircase – Granite Stone/Marble
Master Toilet – Designer combination of ceramic tiles dado up to door level | Wash Basin – Wash Basin of standard make
Fittings/Fixtures – Granite/Marble counter, White sanitary fixtures, single lever CP fittings of standard make
Other fixtures – Looking Mirror, Towel Rail/Ring | Water supply – GI/CPVC pipes of reputed make
Kitchen
Kitchen – Modular Kitchen | Dado – Ceramic tiles dado up to 2′-0″ height above working platform.
Working top – Granite Counter | Sink – Stainless steel sink with single bowl & drain board
Fittings – Single lever CP fittings of reputed make | Water supply – GI/CPVC pipes of reputed make
Door Frame – Well seasoned wooden door frames with Architrave
Door Shutters
Main Door – Both side teak veneered/laminated flush door | Bedroom – Both side teak veneered/laminated flush door
Toilet – Both side teak veneered/laminated flush door | Mumty – Commercial door with paint
Window – UPVC/Powder coated glazed aluminium window
Wardrobes – Only niches shall be provided.
Railing – Designer Railing
Electrical work – Conduit Copper electrical wiring for all light and power points with designer modular switches.
Plumbing work – G.I./CPVC Pipes of reputed make | Security – Basic intercom within the complex
Entrance Ground Floor Lobby will be air-conditioned in all towers
Walls – Punning with Oil Bound Distemper in pleasing color | Ceiling – Oil Bound distemper-White Color
External finish
Texture Paint/Weather proof paint.
Secured Coated Community with access control at entrance and CCTV for Entrance Lobby at Ground Floor in all the towers.
Fire fighting system provided as per NBC norms.
Prices